NEW POST-PRODUCTION FACILITY OPENS IN BRAZIL
Phase One Studio of the Megacine post-production complex of Estudios Mega, Rio de Janeiro and Sao Paulo, Brazil, has just been completed. Additional construction to the complex will include the completion of a ground-up, three-story, 16,000-cubic-foot post-production complex dubbed Phase Two; the Megacine facility is expected to be completed in early 2003.
Phase One features a Euphonix System 5 digital console, Pro Tools, Tascam MMR-8/MMP-16, Dolby DMU and Tesseract loudspeakers; Phase Two will include a 60-seat dubbing stage/screening room with a Euphonix System 5 console, and Kinoton and Christie film and video projection, a second dubbing stage with a Euphonix System 5 and video projection, an ADR/Foley stage and several editing suites.
Visioneering founder Ron Lagerlof was chosen to lead the technical design, work flow and operational aspects; Studio 440 came onboard for design and construction.
Send your “Current” news to Sarah Benzuly at sbenzuly@primediabusiness.com.