Watch: Inside The Studio
Power Station New England, built in 1995 to the original specs of the legendary New York facility, recently went through a complete technical overhaul, including all-new wiring, a restored Neve 8068 installed by original Power Station tech Ed Evans and a fresh infusion of talent, led by engineer/producer Evan Bakke.
In this video preview of our March 2018 Mix cover story, produced by Sonalysts Media (a division of Sonalysts, Waterford, Conn., owner of Power Station New England), Mix talks with Bakke, Eric Toriello of Sonalysts Media, and producer/engineers Joe Blaney and Phil Joly.